Home/Video & News/Company News/Phase-2 Machining Shop in Production
Updated 2026.11
COMPANY NEWS · Updates

Phase-2 Machining Shop Opens; Machining Centers 46 → 62

The new 2,400 ㎡ shop broke ground on June 18 and passed internal acceptance on October 28. All 16 vertical machining centers have in-line leak testing; batch turnaround from casting to machining dropped from 21 days to 15.

2026.11.02 By the Marketing Dept. 1,284 Views About 6 min Share
二期机加车间
The Phase-2 machining shop on acceptance day, October 28. Sixteen new machines line the west wall; a 3.2 m central aisle is kept for AGV feeding.

On the afternoon of October 28, the Phase-2 machining shop passed internal acceptance. Vertical machining centers grew from 46 → 62 units; together with 8 die-casting cells, 3 CMMs and 6 leak-test stations, casting, machining and inspection all sit in one park — castings no longer leave the site between casting and machining.

Why Build Another Shop

For the past two years machining was the bottleneck. At full load the 8 die-casting cells turn out 4,200 shots a day, but with only 46 machining centers, castings often waited in the yard for a free machine. From H2 2025, new-energy ECU orders came in smaller batches across more models — monthly changeovers rose from 9 to 23, stretching waiting times further.

Instead of a new building, we extended 2,400 ㎡ along the west wall of the old shop: the logistics gate stays the same, castings reach the machining line in 3 minutes, saving one transfer and one re-validation compared with expanding on another site.

  • Batch Turnaround: 21 days → 15 days
  • WIP Dwell Time: average 3.6 days → 1.2 days
  • Per-machine Changeover: 52 min → 34 min (for fixture pre-set + program pre-load)

The 16 New Machines

All 16 are vertical machining centers, laid out by process rather than piled up by model — no “can-do-everything, does-everything-slowly” universal machines.

Phase-2 Machining Shop Equipment List (as of 2026.10.28)
EquipmentModelQuantityStroke / SpecificationsMain Applications
Vertical Machining CenterDoosan DNM 57008 units1050 × 570Housing Faces & Bearing Seats
Vertical Machining CenterHaitian VMC8506 units800 × 500End Caps & Bracket Small Parts
4-axis Machining CenterHaitian VMC850-4A2 units4-axis SimultaneousAngled Oil Holes in One Setup
In-line Leak-test StationsIn-house · Differential-pressure16 Staff0.5 bar · ≤8cc/minRandom Checks with Stop on Deviation

The equipment is not for show: every machine outlet feeds a leak-test station, measuring dimensions and air-tightness within the takt; off-spec parts stop the machine immediately instead of waiting for sampling to catch them.

What In-line Leak Testing Means

The biggest risk in housings is coaxiality of bearing seats and oil passages. It used to rely on first-article CMM plus 2-hour patrols — issues surfaced late, and dozens of parts in a batch could need rework. Now the machine judges itself: if the leak check fails, that shot stops on the spot; the supervisor reviews the data at the machine and restarts after correction.

First-article CMM检测
First articles still go through full-dimension CMM, with reports archived per batch and traceable to the exact machine and shift.

What Actually Changed in Lead Time & Capacity

62unitsVertical Machining Center
15daysStandard Batch Lead Time
120k pcsMonthly Housing Output
4,200ShotsDaily Die-casting Output

“Before, our 62 machines were the constraint — scheduling started by asking which machine was free; now the machines wait for the schedule. It looks like a small difference, but for the customer it means waiting a week less.”

Chen Liqun · Production Director

What to See On Site

The 16 machines, 16 in-line leak-test stations and the 3-minute logistics passage to the old shop can all be checked one by one on a video tour or during an on-site audit. Machine nameplates, commissioning years, run logs and the acceptance file for this expansion are kept in the shop office, available anytime.

If you are shortlisting suppliers, bring drawings and annual volume — we quote lead times from the Phase-2 shop’s actual takt, not theoretical values.

RT
Marketing Dept., Demo Company 01Published 2026.11.02 · Data verified by the Production Dept.
Previous · 2026.10.18 Annual VDA 6.3 process audit completed with German Tier-1 customer Next · 2026.09.27 Hannover Messe 2026 · Booth Hall 6 / D42